Our full ‘in house’ set up enables the fabrication of large bridges and walkways.
A fully fabricated and installed footbridge at Victoria Park, Ebbw Vale, South Wales. The bridge is 35mtrs long, weighing nearly 35 tonnes in weight and crosses a railway line and river. The bridge fabricated in our own workshop was delivered to site in two halves and installed over a weekend.
The Walpole Railway Footbridge in Llanhilleth South Wales, 20 mtrs long, fully fabricated in our own workshops and installed in an overnight possession.
The Nant-y-Waun footbridge in Brynmawr Gwent is an ornamental bridge 20 mtrs long creating a circular footpaths around a landscaped old industrial pond.
Railway Bridge in position for Alun Griffiths Contractors and The Blaenavon Railway, Varteg Road Blaenavon”
After leaving our yard at 5-30am both bridges are in position by 8-10am on Saturday 10th June 2011
Kingussie High School Footbridge, Highlands, Scotland. Saturday July 16th.
Possession started 11pm, bridge installation completed by 2am